Production bottlenecks are generally considered to be temporary blockades to increased output; they can be thrown up anywhere along the course of a production process. Some are easy to identify and to remedy, while others are devilish.
The bottleneck that is easy to cope................................. is stationary. Work-in-process inventory piles..................... quickly behind it; clearly, little is getting through. Its cause is usually also clear – a machine has broken........................ or key workers are absent or demand has simply outstripped the clear, rated capacity of a machine – and the remedy follows easily. Such bottlenecks often occur........................ service operations, causing customer waits.
More subtle are bottlenecks that shift from one part of the process to another or that have no clear cause. Inventories build up in different places and at different times. Such bottlenecks creep up on management and demand more thorough investigation. Perhaps they were detected as flaws in a product’s quality caused inadvertently by one or more workers trying to keep pace with production demands that should not have been placed on them. Or, they may be caused by missing parts. They may be caused by new product startup or changes in the mix of products through the factory. In such cases the remedies are less clear-cut, and some analysis is called for.
The phrasal verb creep up in paragraph 3, is closest in meaning to:
 

Provas

Questão presente nas seguintes provas
1303410 Ano: 2018
Disciplina: Inglês (Língua Inglesa)
Banca: FEPESE
Orgão: ABEPRO
(Title)
Production bottlenecks are generally considered to be temporary blockades to increased output; they can be thrown up anywhere along the course of a production process. Some are easy to identify and to remedy, while others are devilish.
The bottleneck that is easy to cope................................. is stationary. Work-in-process inventory piles..................... quickly behind it; clearly, little is getting through. Its cause is usually also clear – a machine has broken........................ or key workers are absent or demand has simply outstripped the clear, rated capacity of a machine – and the remedy follows easily. Such bottlenecks often occur........................ service operations, causing customer waits.
More subtle are bottlenecks that shift from one part of the process to another or that have no clear cause. Inventories build up in different places and at different times. Such bottlenecks creep up on management and demand more thorough investigation. Perhaps they were detected as flaws in a product’s quality caused inadvertently by one or more workers trying to keep pace with production demands that should not have been placed on them. Or, they may be caused by missing parts. They may be caused by new product startup or changes in the mix of products through the factory. In such cases the remedies are less clear-cut, and some analysis is called for.
The underlined word in “Or, they may be caused by missing parts.”, is being used to express:
 

Provas

Questão presente nas seguintes provas
1303409 Ano: 2018
Disciplina: Inglês (Língua Inglesa)
Banca: FEPESE
Orgão: ABEPRO
(Title)
Production bottlenecks are generally considered to be temporary blockades to increased output; they can be thrown up anywhere along the course of a production process. Some are easy to identify and to remedy, while others are devilish.
The bottleneck that is easy to cope................................. is stationary. Work-in-process inventory piles..................... quickly behind it; clearly, little is getting through. Its cause is usually also clear – a machine has broken........................ or key workers are absent or demand has simply outstripped the clear, rated capacity of a machine – and the remedy follows easily. Such bottlenecks often occur........................ service operations, causing customer waits.
More subtle are bottlenecks that shift from one part of the process to another or that have no clear cause. Inventories build up in different places and at different times. Such bottlenecks creep up on management and demand more thorough investigation. Perhaps they were detected as flaws in a product’s quality caused inadvertently by one or more workers trying to keep pace with production demands that should not have been placed on them. Or, they may be caused by missing parts. They may be caused by new product startup or changes in the mix of products through the factory. In such cases the remedies are less clear-cut, and some analysis is called for.
The underlined word in “Perhaps they were detected as flaws in a product’s quality caused inadvertently by one…”, has its correct synonym in which alternative?
 

Provas

Questão presente nas seguintes provas
1303408 Ano: 2018
Disciplina: Inglês (Língua Inglesa)
Banca: FEPESE
Orgão: ABEPRO
(Title)
Production bottlenecks are generally considered to be temporary blockades to increased output; they can be thrown up anywhere along the course of a production process. Some are easy to identify and to remedy, while others are devilish.
The bottleneck that is easy to cope................................. is stationary. Work-in-process inventory piles..................... quickly behind it; clearly, little is getting through. Its cause is usually also clear – a machine has broken........................ or key workers are absent or demand has simply outstripped the clear, rated capacity of a machine – and the remedy follows easily. Such bottlenecks often occur........................ service operations, causing customer waits.
More subtle are bottlenecks that shift from one part of the process to another or that have no clear cause. Inventories build up in different places and at different times. Such bottlenecks creep up on management and demand more thorough investigation. Perhaps they were detected as flaws in a product’s quality caused inadvertently by one or more workers trying to keep pace with production demands that should not have been placed on them. Or, they may be caused by missing parts. They may be caused by new product startup or changes in the mix of products through the factory. In such cases the remedies are less clear-cut, and some analysis is called for.
The plural form of the word ‘analysis’, is:
 

Provas

Questão presente nas seguintes provas
1303407 Ano: 2018
Disciplina: Inglês (Língua Inglesa)
Banca: FEPESE
Orgão: ABEPRO
(Title)
Production bottlenecks are generally considered to be temporary blockades to increased output; they can be thrown up anywhere along the course of a production process. Some are easy to identify and to remedy, while others are devilish.
The bottleneck that is easy to cope................................. is stationary. Work-in-process inventory piles..................... quickly behind it; clearly, little is getting through. Its cause is usually also clear – a machine has broken........................ or key workers are absent or demand has simply outstripped the clear, rated capacity of a machine – and the remedy follows easily. Such bottlenecks often occur........................ service operations, causing customer waits.
More subtle are bottlenecks that shift from one part of the process to another or that have no clear cause. Inventories build up in different places and at different times. Such bottlenecks creep up on management and demand more thorough investigation. Perhaps they were detected as flaws in a product’s quality caused inadvertently by one or more workers trying to keep pace with production demands that should not have been placed on them. Or, they may be caused by missing parts. They may be caused by new product startup or changes in the mix of products through the factory. In such cases the remedies are less clear-cut, and some analysis is called for.
Analyze the sentences according to structure and grammar use.
1. ‘…a machine has broken…’ is written in the present perfect tense. 2. The negative form of: ‘a machine has broken...’, is: ‘…a machine doesn’t have broken …’ 3. The words in bold in ”… clearly, little is getting through.” and “…more workers trying to keep pace with production…” are in the present progressive tense. 4. The negative form of “…and the remedy follows easily.” is “and the remedy doesn’t follow easily.”
Choose the alternative which presents the correct ones.
 

Provas

Questão presente nas seguintes provas
1303406 Ano: 2018
Disciplina: Inglês (Língua Inglesa)
Banca: FEPESE
Orgão: ABEPRO
(Title)
Production bottlenecks are generally considered to be temporary blockades to increased output; they can be thrown up anywhere along the course of a production process. Some are easy to identify and to remedy, while others are devilish.
The bottleneck that is easy to cope................................. is stationary. Work-in-process inventory piles..................... quickly behind it; clearly, little is getting through. Its cause is usually also clear – a machine has broken........................ or key workers are absent or demand has simply outstripped the clear, rated capacity of a machine – and the remedy follows easily. Such bottlenecks often occur........................ service operations, causing customer waits.
More subtle are bottlenecks that shift from one part of the process to another or that have no clear cause. Inventories build up in different places and at different times. Such bottlenecks creep up on management and demand more thorough investigation. Perhaps they were detected as flaws in a product’s quality caused inadvertently by one or more workers trying to keep pace with production demands that should not have been placed on them. Or, they may be caused by missing parts. They may be caused by new product startup or changes in the mix of products through the factory. In such cases the remedies are less clear-cut, and some analysis is called for.
Study the following sentence:
“Perhaps they were detected as flaws in a product’s quality caused inadvertently by one or more workers trying to keep pace with production demands that should not have been placed on them.”
1. the word ‘trying’ is being used in the sentence as a continuous verb. 2. the tense used in: ‘were detected, is the passive voice. 3. the word ‘flaws’ means ‘imperfections’. 4. in ‘product’s quality’, the (‘s) indicates possession.
Choose the alternative which presents the correct ones.
 

Provas

Questão presente nas seguintes provas
1291286 Ano: 2018
Disciplina: Matemática Financeira
Banca: FEPESE
Orgão: ABEPRO
Um agiota emprestou uma certa quantia a um amigo, a uma taxa de juros (compostos) de 100% ao ano. Ao final de 3 anos, a dívida montava a R$ 8.000,00.
Qual foi a quantia emprestada?
 

Provas

Questão presente nas seguintes provas
1291285 Ano: 2018
Disciplina: Matemática Financeira
Banca: FEPESE
Orgão: ABEPRO
Qual é a taxa de juros efetiva equivalente a 120% ao ano com capitalização mensal?
 

Provas

Questão presente nas seguintes provas
1291282 Ano: 2018
Disciplina: Matemática Financeira
Banca: FEPESE
Orgão: ABEPRO
Qual é a diferença entre juros simples e juros compostos?
 

Provas

Questão presente nas seguintes provas
1291281 Ano: 2018
Disciplina: Matemática Financeira
Banca: FEPESE
Orgão: ABEPRO
Comparando-se o sistema de amortização constante (SAC) com o sistema de amortização francês (price), é correto afirmar:
 